CAT प्रश्न और उत्तर का अभ्यास करें
8प्र: In which city 2017 Global Entrepreneurship Summit will be held ? 1089 05b5cc6c2e4d2b4197774dbd7
5b5cc6c2e4d2b4197774dbd7- 1New Delhifalse
- 2Hyderabadtrue
- 3Bangalurufalse
- 4Mumbaifalse
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 2. "Hyderabad"
व्याख्या :
Answer: B) Hyderabad Explanation: Government of India and the United States met today at NITI Aayog to plan the 2017 Global Entrepreneurship Summit, which will be held November 28-30 at the Hyderabad International Convention Centre in Hyderabad, India. The Summit will be inaugurated by Prime Minister Narendra Modi and Advisor to the President, Ivanka Trump, who leads the U.S. delegation.
प्र: P can do a piece of work in 5 less days than Q. If both of them can do the same work in 1119days, in how many days will Q alone do the same work ? 1497 05b5cc6c2e4d2b4197774dbcd
5b5cc6c2e4d2b4197774dbcd- 124 daysfalse
- 225 daystrue
- 320 daysfalse
- 419 daysfalse
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 2. "25 days"
व्याख्या :
Answer: B) 25 days Explanation: Let Q complete that work in 'L' days => 1L + 1L-5 = 9100 => 9L2-245L+500=0 L = 25 days.
प्र: In a competitive exam, the number of passed students was four times the number of failed students. If there had been 35 fewer appeared students and 9 more had failed, the ratio of passed and failed students would have been 2 : 1, then the total number of students appered for the exam ? 8176 05b5cc6c2e4d2b4197774dbbe
5b5cc6c2e4d2b4197774dbbe- 1175false
- 2165false
- 3155true
- 4145false
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 3. "155"
व्याख्या :
Answer: C) 155 Explanation: Let the number of failed students be x => Number of passed students = 4x So total number of students was 5x From the given data, If total number of students be 5x – 35 => 4x-35-9/x+9 = 2/1 => 4x – 44 = 2(x + 9) => 4x – 2x = 18 + 44 => x = 31 Total number = 31×5 = 155
प्र: When a women sells 20 articles for Rs. 160, there is 40% loss. How many articles should she sell for Rs. 240 in order to earn 20% profit ? 3225 05b5cc6c2e4d2b4197774dbc3
5b5cc6c2e4d2b4197774dbc3- 116false
- 215true
- 317false
- 414false
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 2. "15"
व्याख्या :
Answer: B) 15 Explanation: Given when she sells at Rs. 160 for 20 articles, she get 40% loss. Then, to get 20% profit selling at Rs. 240 for let 'P' articles => 1602060=240p120 => 120 x 160 x P = 20 x 70 x 240 => P = 15 articles.
प्र: Three friends Rudra, Siva and Anvesh start to run around a circular stadium. They complete a revolution in 24, 36 and 30 seconds respectively. After how many minutes will they meet at the starting point ? 2012 05b5cc6c2e4d2b4197774dbb4
5b5cc6c2e4d2b4197774dbb4- 160false
- 2120false
- 3360false
- 46true
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 4. "6"
व्याख्या :
Answer: D) 6 Explanation: For this we have to find the LCM of 24, 36 and 30 LCM of 24, 36 and 30 = 360 sec 360/60 min = 6 minutes.
प्र: Solve the Logical Puzzle ? 1294 05b5cc6c2e4d2b4197774dbb9
5b5cc6c2e4d2b4197774dbb9- 12false
- 24true
- 38false
- 40false
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 2. "4"
व्याख्या :
Answer: B) 4 Explanation:
प्र: P alone can do a piece of work in 24 days. The time taken by P to complete one-third of work is equal to time taken by Q to complete half of the work. How many days are required to complete by P and Q working together ? 1657 05b5cc6c2e4d2b4197774dbaa
5b5cc6c2e4d2b4197774dbaa- 19 3/5 daystrue
- 27 daysfalse
- 36 3/7 daysfalse
- 48 daysfalse
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 1. "9 3/5 days"
व्याख्या :
Answer: A) 9 3/5 days Explanation: Let the total work be 'W' As per the given information, P can complete the work 'W' in 24 days. => one day work of P = W/24 And also given that, The time taken by P to complete one-third of work is equal to time taken by Q to complete half of the work => PW/3 = QW/2 => P's 1 day = W/24 ? = W/3 => ? = 24W/3W = 8 => QW/2 = 8 days => Q alone can complete the work W in 16 days => P + Q can complete the work in 1/24 + 1/16 = 5/48 => 48/5 days = 9 3/5 days.
प्र: Find the missing number in the following Series ? 18, 97, 26, 91, ? , 83 2202 05b5cc6c2e4d2b4197774dbaf
5b5cc6c2e4d2b4197774dbaf- 132false
- 236false
- 330false
- 434true
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 4. "34"
व्याख्या :
Answer: D) 34 Explanation: The given series follows the pattern that, 18, 97, 26, 91, ?, 83 => 18 + 8 = 26 => 97 - 8 = 91 => 26 + 8 = 34 => 91 - 8 = 83 Hence, the missing number is 34.

