Quantitative Aptitude Practice Question and Answer
8Q: Find the one which does not belong to that group ? 4766 05b5cc6ebe4d2b4197774eeaf
5b5cc6ebe4d2b4197774eeaf- 1KMNLfalse
- 2JLMKfalse
- 3PRSQfalse
- 4VWYZtrue
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 4. "VWYZ"
Explanation :
Answer: D) VWYZ Explanation: K+2 M+1 N-2 L, P+2 R+1 S-2 Q, V+1 W+2 Y+1 Z, J+2 L+1 M-2 K and W+2 Y+1 Z-2 X. Except VWYZ, all the other groups follow similar pattern.
Q: Three taps I, J and K can fill a tank in 20,30and 40 minutes respectively. All the taps are opened simultaneously and after 5 minutes tap A was closed and then after 6 minutes tab B was closed .At the moment a leak developed which can empty the full tank in 70 minutes. What is the total time taken for the completely full ? 4759 05b5cc73de4d2b4197774f952
5b5cc73de4d2b4197774f952- 124.315 minutesfalse
- 226.166 minutestrue
- 322.154 minutesfalse
- 424 minutesfalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 2. "26.166 minutes"
Explanation :
Answer: B) 26.166 minutes Explanation: Upto first 5 minutes I, J and K will fill => 5[(1/20)+(1/30)+(1/40)] = 65/120 For next 6 minutes, J and K will fill => 6[(1/30)+(1/40)] = 42/120 So tank filled upto first 11 minutes = (65/120) + (42/120) = 107/120 So remaining tank = 13/120 Now at the moment filling with C and leakage @ 1/60 per minute= (1/40) - (1/70) = 3/280.So time taken to fill remaining 13/120 tank =(13/120) /(3/280) = 91/6 minutes Hence total time taken to completely fill the tank = 5 + 6 + 91/6 = 26.16 minutes.
Q: Amit can do a piece of work in 45 days, but Bharath can do the same work in 5 days less, than Amit, when working alone. Amit and Bharath both started the work together but Bharath left after some days and Amit finished the remaining work in 56 days with half of his efficiency but he did the work with Bharath with his complete efficiency. For how many days they had worked together? 4755 05b5cc7d0e4d2b419777511db
5b5cc7d0e4d2b419777511db- 16false
- 28true
- 39false
- 412false
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 2. "8"
Explanation :
Answer: B) 8 Explanation: AmitBharatNo.of Days4540Efficiency2.22Percent(=145)2.5 Percent(=140) Amit did the work in 56 days = 56×145×2=2845 Therefore, Rest work 17/45 was done by Amit and Bharath = 174517360 = 8 days ( since Amit and Bharath do the work in one day = 145+140=17360)
Q: अमर किसी कार्य के 1/4 भाग को 3 दिन तथा भास्कर उसी कार्य के 1/6 भाग को 4 दिन में पूरा कर सकता है। यदि दोनों मिलकर कार्य को पूरा करें तो 1800 रूपये के मेहनताने में से अमर को कितनी राशि मिलेंगी? 4742 15d148fd797a68b089a7aa70d
5d148fd797a68b089a7aa70d- 1Rs 600false
- 2Rs 1000false
- 3Rs 1080false
- 4Rs 1200true
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 4. "Rs 1200"
Q: Solve the equation 122x+1 = 1 ? 4711 05b5cc6f4e4d2b4197774efd7
5b5cc6f4e4d2b4197774efd7- 1-1/2true
- 21/2false
- 31false
- 4-1false
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 1. "-1/2"
Explanation :
Answer: A) -1/2 Explanation: Rewrite equation as 122x+1 = 120 Leads to 2x + 1 = 0 Solve for x : x = -1/2
Q: A box contains 3 blue marbles, 4 red, 6 green marbles and 2 yellow marbles. If two marbles are picked at random, what is the probability that they are either blue or yellow ? 4693 05b5cc6dae4d2b4197774e8d7
5b5cc6dae4d2b4197774e8d7- 13/17false
- 24/21false
- 32/21true
- 45/17false
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 3. "2/21"
Explanation :
Answer: C) 2/21 Explanation: Given that there are three blue marbles, four red marbles, six green marbles and two yellow marbles. Probability that both marbles are blue = ³C₂/¹⁵C₂ = (3 x 2)/(15 x 14) = 1/35 Probability that both are yellow = ²C₂/¹⁵C₂ = (2 x 1)/(15 x 14) = 1/105 Probability that one blue and other is yellow = (³C₁ x ²C₁)/¹⁵C₂ = (2 x 3 x 2)/(15 x 14) = 2/35 Required probability = 1/35 + 1/105 + 2/35 = 3/35 + 1/105 = 1/35(3 + 1/3) = 10/(3 x 35) = 2/21
Q: अ,ब तथा स मिलकर किसी काम को 8 दिन में कर सकते हैं। यदि अ अकेले 20 दिन तथा ब 30 दिन में कर सकता है। तो बतायें स अकेला कितना दिन में इसी काम को पूरा करेगा? 4688 25d14842c9aeb0a08f1e67220
5d14842c9aeb0a08f1e67220- 116false
- 218false
- 320false
- 424true
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 4. "24"
Q: The current of a stream at 1 kmph. A motor boat goes 35 km upstream and back to the starting point in 12 hours. The speed of the motor boat in still water is ? 4682 05b5cc6dce4d2b4197774e9c4
5b5cc6dce4d2b4197774e9c4- 18 kmphfalse
- 26 kmphtrue
- 37.5 kmphfalse
- 45.5 kmphfalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 2. "6 kmph"
Explanation :
Answer: B) 6 kmph Explanation: Speed of the stream = 1Motor boat speed in still water be = x kmphDown Stream = x + 1 kmphUp Stream = x - 1 kmph[35/(x + 1)] + [35/(x - 1)] = 12x = 6 kmph

