Quantitative Aptitude प्रश्न और उत्तर का अभ्यास करें

प्र: A boat takes 2 hours to travel from point A to B in still water. To find out its speed upstream, which of the following information is/are required? A. Distance between point A and B. B. Time taken to travel downstream from B to A. C. Speed of the stream of water. 2287 0

  • 1
    Only A and B
    सही
    गलत
  • 2
    Only B and C
    सही
    गलत
  • 3
    All are required
    सही
    गलत
  • 4
    Any one pair of A and B, B and C or C and A is sufficient
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 4. "Any one pair of A and B, B and C or C and A is sufficient"
व्याख्या :

Answer: D) Any one pair of A and B, B and C or C and A is sufficient Explanation: Let distance between A & B = d kmLet speed in still water = x kmphLet speed of current = y kmph from the given data,d/x = 2 From A) we get dFrom B) we get d/x+yFrom C) we get y   So, Any one pair of A and B, B and C or C and A is sufficient to give the answer i.e, the speed of upstream.

प्र: Two pipes A and B can fill a tank in 16 hrs and 12 hrs respectively. The capacity of the tank is 240 liters. Both the pipes are opened simultaneously and closed after 2 hrs. How much more water need to fill the tank? 2285 0

  • 1
    70 lit
    सही
    गलत
  • 2
    170 lit
    सही
    गलत
  • 3
    90 lit
    सही
    गलत
  • 4
    190 lit
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 2. "170 lit"
व्याख्या :

Answer: B) 170 lit Explanation: Given A alone can fill the tank of capacity 240 lit in 16 hrs. => A can fill in 1 hr = 240/16 = 15 lit => B alone can fill the tank of capacity 240 lit in 12 hrs. => B can fill in 1 hr = 240/12 = 20 lit Now, (A + B) in 1 hr = 15 + 20 = 35 lit But they are opened for 2 hrs => 2 x 35 = 70 lit rae filled Remaining water to be filled in tank of 240 lit = 240 - 70 = 170 lit.

प्र: X can complete the work in 10 days, Y can do the same in 15 days. If they are hired for 5 days to do the work together, what is the work that left unfinished? 2285 0

  • 1
    1/3
    सही
    गलत
  • 2
    2/3
    सही
    गलत
  • 3
    1/6
    सही
    गलत
  • 4
    5/6
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 3. "1/6"
व्याख्या :

Answer: C) 1/6 Explanation: Given X can do in 10 days  => 1 day work of X = 1/10   Y can do in 15 days  => 1 day work of Y = 1/15   1day work of (X + Y) = 1/10 + 1/15 = 1/6   Given they are hired for 5 days  => 5 days work of (X + Y) = 5 x 1/6 = 5/6  Therefore, Unfinished work = 1 - 5/6 = 1/6

प्र: A number when subtracted by 1/7 th of itself gives the same value as the sum of all the angles of a triangle. What is the number? 2285 0

  • 1
    420
    सही
    गलत
  • 2
    210
    सही
    गलत
  • 3
    70
    सही
    गलत
  • 4
    35
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 2. "210"
व्याख्या :

Answer: B) 210 Explanation: Let the required number be 'p' We know, sum of angles in a triangle are 180 deg According to given data, p - p/7 = 180 7p - p = 180 x 7 => 6p = 1260 => p = 1260/6 = 210

प्र: A sold an article to B at 40% profit and B sold it to C at 50% profit, then what will be profit percent with respect to A ? 2284 0

  • 1
    97 %
    सही
    गलत
  • 2
    110 %
    सही
    गलत
  • 3
    135 %
    सही
    गलत
  • 4
    115 %
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 2. "110 %"
व्याख्या :

Answer: B) 110 % Explanation: % Profit with respect to A = 40 + 50 + (40 x 50)/100 = 90 + 20 = 110 %.

प्र: What is the common ratio of the following geometric sequence? 4, 2, 1, 0.5, 0.25, 0.125,... 2272 0

  • 1
    0.5
    सही
    गलत
  • 2
    -1
    सही
    गलत
  • 3
    1.5
    सही
    गलत
  • 4
    -0.5
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 1. "0.5"
व्याख्या :

Answer: A) 0.5 Explanation: In mathematics, a geometric progression, also known as a geometric sequence, is a sequence of numbers where each term after the first is found by multiplying the previous one by a fixed, non-zero number called the common ratio.   Herein the given sequence, 4, 2, 1, 0.5, 0.25, 0.125,... Common Ratio r = 2/4 = 1/2 = 0.5/1 = 0.25/0.5 = 0.125/0.25 == 0.5.

प्र: एक रेलगाड़ी की लम्बाई 300 मीटर हैं। वह 72 किमी प्रति घंटे की रफ्तार से एक खम्भे को कितनी देर में पार कर जाएगी? 2266 0

  • 1
    18 सैंकण्ड
    सही
    गलत
  • 2
    15 सैंकण्ड
    सही
    गलत
  • 3
    12 सैंकण्ड
    सही
    गलत
  • 4
    20 सैंकण्ड
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 2. "15 सैंकण्ड"

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई