Bank Exams प्रश्न और उत्तर का अभ्यास करें
8प्र: In a year, Holi was enjoyed on 6th March 9 AM and Deepawali was celebrated on 11th November 8 PM. The total time interval (in hours) between the two was ? 2304 05b5cc73ae4d2b4197774f8ab
5b5cc73ae4d2b4197774f8ab- 12101 hrsfalse
- 24125 hrsfalse
- 35124 hrsfalse
- 46011 hrstrue
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 4. "6011 hrs"
व्याख्या :
Answer: D) 6011 hrs Explanation: From March 6th to November 11th, there are 250 days and Thus 250 x 24 hoursSo from Mar 6th 9AM to Nov 11th 8PM, there will be 250 x 24 + 11 hours = 6011 hrs.
प्र: A can do a piece of work in 10 days, B in 15 days. They work together for 5 days, the rest of the work is finished by C in two more days. If they get Rs. 3000 as wages for the whole work, what are the daily wages of A, B and C respectively (in Rs): 2303 05b5cc7d0e4d2b419777511d6
5b5cc7d0e4d2b419777511d6- 1200, 250, 300false
- 2300, 200, 250true
- 3200, 300, 400false
- 4None of thesefalse
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 2. "300, 200, 250"
व्याख्या :
Answer: B) 300, 200, 250 Explanation: A's 5 days work = 50% B's 5 days work = 33.33% C's 2 days work = 16.66% [100- (50+33.33)] Ratio of contribution of work of A, B and C = 50 : 3313 : 1623 = 3 : 2 : 1 A's total share = Rs. 1500 B's total share = Rs. 1000 C's total share = Rs. 500 A's one day's earning = Rs.300 B's one day's earning = Rs.200 C's one day's earning = Rs.250
प्र: What number should replace the question mark? 125, 138, 164, ?, 255 2303 05b5cc6a1e4d2b4197774cabd
5b5cc6a1e4d2b4197774cabd- 1189false
- 2197false
- 3200false
- 4203true
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 4. "203"
व्याख्या :
Answer: D) 203 Explanation: The given number series is 125, 138, 164, ?, 255 125 125 + 13x1 = 138 138 + 13x2 = 164 164 + 13x3 = 203 203 + 13x4 = 255 Hence, the missing number in the series is 203.
प्र: Two pipes A and B can fill a tank in 16 hrs and 12 hrs respectively. The capacity of the tank is 240 liters. Both the pipes are opened simultaneously and closed after 2 hrs. How much more water need to fill the tank? 2303 05b5cc6bbe4d2b4197774d802
5b5cc6bbe4d2b4197774d802- 170 litfalse
- 2170 littrue
- 390 litfalse
- 4190 litfalse
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 2. "170 lit"
व्याख्या :
Answer: B) 170 lit Explanation: Given A alone can fill the tank of capacity 240 lit in 16 hrs. => A can fill in 1 hr = 240/16 = 15 lit => B alone can fill the tank of capacity 240 lit in 12 hrs. => B can fill in 1 hr = 240/12 = 20 lit Now, (A + B) in 1 hr = 15 + 20 = 35 lit But they are opened for 2 hrs => 2 x 35 = 70 lit rae filled Remaining water to be filled in tank of 240 lit = 240 - 70 = 170 lit.
प्र: Which of the following is Not an Operating System? 2303 05b5cc6afe4d2b4197774d1b0
5b5cc6afe4d2b4197774d1b0- 1UNIXfalse
- 2Windows NTfalse
- 3C++true
- 4DOSfalse
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 3. "C++"
व्याख्या :
Answer: C) C++ Explanation: C++ is not an Operating System. An Operating System is a collection of system programs that manages all the other programs application programs in a computer as well as the allocation and use of hardware resources such as the CPU, Memory and the Hard Disk Drive. It acts as an interface between the hardware and the user level program. It controls and facilitates the overall operation of a computer. Here UNIX : UNIX is a popular multi-user, multitasking operating system (OS) developed at Bell Labs. Windows NT : Windows NT is a family of operating systems produced by Microsoft, the first version of which was released in July 1993. DOS : DOS is Disk Operating System. The term DOS can refer to any operating system. C++ : C++ is a programming language and computing platform. Hence, C++ is not an Operating System.
प्र: X can complete the work in 10 days, Y can do the same in 15 days. If they are hired for 5 days to do the work together, what is the work that left unfinished? 2302 05b5cc6bfe4d2b4197774da0a
5b5cc6bfe4d2b4197774da0a- 11/3false
- 22/3false
- 31/6true
- 45/6false
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 3. "1/6"
व्याख्या :
Answer: C) 1/6 Explanation: Given X can do in 10 days => 1 day work of X = 1/10 Y can do in 15 days => 1 day work of Y = 1/15 1day work of (X + Y) = 1/10 + 1/15 = 1/6 Given they are hired for 5 days => 5 days work of (X + Y) = 5 x 1/6 = 5/6 Therefore, Unfinished work = 1 - 5/6 = 1/6
प्र: A number when subtracted by 1/7 th of itself gives the same value as the sum of all the angles of a triangle. What is the number? 2302 05b5cc619e4d2b4197774b700
5b5cc619e4d2b4197774b700- 1420false
- 2210true
- 370false
- 435false
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 2. "210"
व्याख्या :
Answer: B) 210 Explanation: Let the required number be 'p' We know, sum of angles in a triangle are 180 deg According to given data, p - p/7 = 180 7p - p = 180 x 7 => 6p = 1260 => p = 1260/6 = 210
प्र: During which process is water produced? 2302 05b5cc655e4d2b4197774bd5f
5b5cc655e4d2b4197774bd5f- 1Acetyl COA formationfalse
- 2Electron transport chaintrue
- 3Alcohol fermentationfalse
- 4citric acid cyclefalse
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 2. "Electron transport chain"
व्याख्या :
Answer: B) Electron transport chain Explanation:

