Bank Exams Practice Question and Answer
8Q: K can finish the work in 18 days and L can do the same work in 15 days. L worked for 10 days and left the job. In how many days, K alone can finish the remaining work ? 2167 05b5cc774e4d2b4197775002f
5b5cc774e4d2b4197775002f- 15.5 daysfalse
- 26 daystrue
- 34.2 daysfalse
- 45 daysfalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 2. "6 days"
Explanation :
Answer: B) 6 days Explanation: L's 10 days work = 115×10=23 Remaining work = 1-23=13 Now, work is done by K in one day = 1/18 1/3 work is done by K in 18×13 = 6 days
Q: What is the meaning of the four colour dots in the news paper? 2166 05b5cc683e4d2b4197774c2a6
5b5cc683e4d2b4197774c2a6- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer :
Explanation :
If you read newspaper daily, then you may be aware of the four coloured dots on the corner of the newspaper. The four dots CMYK — blue (Cyan), pink (Magenta), Yellow and black (Kalio) are registration marks used during printing to help ensure the print is aligned properly. Any colour can be obtained by adding the correct proportion of these four colours. CMYK is used as a base for the colours used in printing newspapers, and these four colours are often printed on the paper in either a heart, dot, or square shape. To print an image, the plates of all these colours are laid out on a page separately and lined up in the same spot while printing. If those four dots are blur or you find the colours overlapping on the image it means the printing is not good. To print an accurate and perfect image, the colors and shape must be arranged precisely and must be claear sharp in order to get the best output. That's why CMYK is also called registration mark. As physically checking all the pages of the paper is not possible for a printer who prints number of news papers daily, he just checks these dots.
Q: Pavan and Sravan are two persons. If Pavan works with his actual efficiency and Sravan twice of his actual efficiency then it takes 25 days to complete the work. But If Pavan works twice of his actual efficiency and Sravan with his normal efficiency then the work is completed in 20 days. How many days would it take if Sravan alone works with his actual efficiency (in Days)? 2166 05b5cc6c7e4d2b4197774ded2
5b5cc6c7e4d2b4197774ded2- 150false
- 2100true
- 370false
- 435false
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 2. "100"
Explanation :
Answer: B) 100 Explanation: Let the Efficiency of pavan be E(P) Let the Efficiency of sravan be E(S) Here Work W = LCM(25,20) = 100 Now, E(P+2S) = 100/25 = 4 ....(1) E(2P+S) = 100/20 = 5 ....(2) Hence, from (1) & (2) we get E(S) = 1 => Number of days Savan alone work to complete the work = 100/1 = 100 days.
Q: Select the correct statement about the Evolution of Animals. 2166 05b5cc6b0e4d2b4197774d29d
5b5cc6b0e4d2b4197774d29d- 1The oldest generally accepted fossils of large animals range in age from 565 to 550 million years old.true
- 2No animal fossils are found in strata formed before the Cambrian explosion.false
- 3Approximately half the phyla of living organisms are found in Cambrian sediments.false
- 4All the abovefalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 1. "The oldest generally accepted fossils of large animals range in age from 565 to 550 million years old."
Explanation :
Answer: A) The oldest generally accepted fossils of large animals range in age from 565 to 550 million years old. Explanation: The oldest generally accepted fossils of large animals range in age from 565 to 550 million years old.
Q: Opening in a wall to let in air or light 2165 05b5cc699e4d2b4197774c70b
5b5cc699e4d2b4197774c70b- 1Ceilingfalse
- 2Doorfalse
- 3Windowtrue
- 4All the abovefalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 3. "Window"
Explanation :
Answer: C) Window Explanation: The Opening in a wall to let in air or light is nothing but a Window.
Q: What type of macromolecule is DNA? 2164 05b5cc622e4d2b4197774b81b
5b5cc622e4d2b4197774b81b- 1Proteinsfalse
- 2Carbohydratesfalse
- 3Nucleic acidstrue
- 4All of the abovefalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 3. "Nucleic acids"
Explanation :
Answer: C) Nucleic acids Explanation: DNA stands for Deoxyribo nucleic acid. It is a nucleic acid made up of monomeric unit called Nucleotide. A nucleotide consist of - a) Sugar - Deoxyribose in DNA ( ribose in RNA) b) An organic base- Adenine, cytosine, guanine.
Q: Albert invested Rs. 8000 in a scheme for 2 years at compound interest rate 5% p.a. How much amount will Albert get on maturity of the fixed deposit ? 2164 05b5cc6e7e4d2b4197774ed9c
5b5cc6e7e4d2b4197774ed9c- 1Rs. 8840false
- 2Rs. 8800false
- 3Rs. 8810false
- 4Nonetrue
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 4. "None"
Explanation :
Answer: D) None Explanation: Amount = 80001+51002 = 8000 x 21/20 x 21/20 = Rs. 8820
Q: How many steps are in the system development life cycle? 2164 05b5cc690e4d2b4197774c431
5b5cc690e4d2b4197774c431- 13false
- 24false
- 35false
- 46true
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 4. "6"
Explanation :
Answer: D) 6 Explanation: The process of System development life cycle goes through a series of stages in step wise fashion that almost every developing company follows. Known as the 'software development life cycle,' these six steps include: 1. Planning 2. Analysis 3. Design 4. Development & implementation 5.Testing & deployment and 6. Maintenance.

