Bank Exams प्रश्न और उत्तर का अभ्यास करें
8प्र: World Population Day is observed on ____ ? 2007 05b5cc6d1e4d2b4197774e3e8
5b5cc6d1e4d2b4197774e3e8- 19 Julyfalse
- 211 Julyfalse
- 315 Julytrue
- 44 Julyfalse
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 3. "15 July"
व्याख्या :
Answer: C) 15 July Explanation: World Population day is an annual event, observed on July 11 every year, which seeks to raise awareness of global population issues.
प्र: An increase in the quantity demanded means that 2007 05b5cc67be4d2b4197774c1b3
5b5cc67be4d2b4197774c1b3- 1The demand curve shifted to rightfalse
- 2Price of the product has declinedfalse
- 3Increase in consumer incomefalse
- 4All the abovetrue
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 4. "All the above"
व्याख्या :
Answer: D) All the above Explanation:
प्र: The capital of Colombia is ? 2006 05b5cc6cce4d2b4197774e11a
5b5cc6cce4d2b4197774e11a- 1Caracasfalse
- 2Santiagofalse
- 3Limafalse
- 4Bogotatrue
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 4. "Bogota"
व्याख्या :
Answer: D) Bogota Explanation:
प्र: 50 men can build a tank in 40days, but though they begin the work together, 5 men quit every ten days. The time needed to build the tank is ? 2006 05b5cc76fe4d2b4197774ff71
5b5cc76fe4d2b4197774ff71- 150 daystrue
- 248 daysfalse
- 347.5 daysfalse
- 449 daysfalse
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 1. "50 days"
व्याख्या :
Answer: A) 50 days Explanation: 50 men can build a tank in 40 days Assume 1 man does 1 unit of work in 1 day Then the total work is 50×40 = 2000 units 50 men work in the first 10 days and completes 50×10 = 500 units of work 45 men work in the next 10 days and completes 45×10 = 450 units of work 40 men work in the next 10 days and completes 40×10 = 400 units of work 35 men work in the next 10 days and completes 35×10 = 350 units of work So far 500 + 450 + 400 + 350 = 1700 units of work is completed and Remaining work is 2000 - 1700 = 300 units 30 men work in the next 10 days. In each day, they does 30 units of work. Therefore, additional days required = 300/30 =10 Thus, total 10+10+10+10+10 = 50 days required.
प्र: Tetraethyl lead is used as 2006 05b5cc6afe4d2b4197774d226
5b5cc6afe4d2b4197774d226- 1Fire extinguisherfalse
- 2Gasoline additivetrue
- 3Mosquito repellentfalse
- 4Pain killerfalse
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 2. "Gasoline additive"
व्याख्या :
Answer: B) Gasoline additive Explanation: Tetraethyl lead is a highly toxic compound used as a gasoline additive. Tetraethyl lead abbreviated as TEL, is an organo lead compound with the formula (CH3CH2)4Pb. It is a petro-fuel additive which in turn caused increased vehicle performance. This is also used as an antiknock agent in gasoline and jet fuels. Tetraethyl lead is absorbed rapidly by the skin, the lungs, and the gastrointestinal tract. It is converted to triethyl lead, which might be responsible for its toxicity.
प्र: Robert is traveling on his cycle and has calculated to reach point A at 2 p.m. if he travels at 10 km/hr; he will reach there at 12 noon if he travels at 15 km/hr. At what speed must he travel to reach A at 1 p.m. ? 2006 05b5cc6dae4d2b4197774e899
5b5cc6dae4d2b4197774e899- 120 kmphfalse
- 218 kmphfalse
- 312 kmphtrue
- 416 kmphfalse
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 3. "12 kmph"
व्याख्या :
Answer: C) 12 kmph Explanation: Let the distance traveled be x km.Then, x/10 - x/15 = 23x - 2x = 60 => x = 60 km.Time taken to travel 60 km at 10 km/hr = 60/10 = 6 hrs.So, Robert started 6 hours before 2. p.m. i.e., at 8 a.m.Required speed = 60/5 = 12 kmph.
प्र: On the eve of Christmas, all the things are kept in apple-pie order. 2006 05b5cc6bae4d2b4197774d7ee
5b5cc6bae4d2b4197774d7ee- 1with neatnessfalse
- 2in perfect orderfalse
- 3in jumbled orderfalse
- 4Both A & Btrue
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 4. "Both A & B"
व्याख्या :
Answer: D) Both A & B Explanation:
प्र: If 5 men and 2 boys working together, can do four times as much work per hour as a man and a boy together. Find the ratio of the work done by a man and that of a boy for a given time ? 2004 05b5cc6e2e4d2b4197774ec4d
5b5cc6e2e4d2b4197774ec4d- 11:2false
- 21:3false
- 33:1false
- 42:1true
- उत्तर देखेंउत्तर छिपाएं
- Workspace
- SingleChoice
उत्तर : 4. "2:1"
व्याख्या :
Answer: D) 2:1 Explanation: 5M + 2B = 4(1M + 1B) 5M + 2B = 4M + 4B 1M = 2B The required ratio of work done by a man and a boy = 2:1

