प्रश्न और उत्तर का अभ्यास करें

प्र: A drink vendor has 80 liters of Mazza, 144 liters of Pepsi, and 368 liters of Sprite. He wants to pack them in cans, so that each can contains the same number of liters of a drink, and doesn't want to mix any two drinks in a can. What is the least number of cans required? 1773 0

  • 1
    35
    सही
    गलत
  • 2
    36
    सही
    गलत
  • 3
    37
    सही
    गलत
  • 4
    38
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 3. "37"
व्याख्या :

Answer: C) 37 Explanation: If we want to pack the drinks in the least number of cans possible, then each can should contain the maximum numbers of liters possible.As each can contains the same number liters of a drink, the number of liters in each can is a comman factor for 80,144 and 368; and it is also the highest such factor, as we need to store the maximum number of liters in each can. So, the number of liters in each can  = HCF of 80,144 and 368 = 16 liters. Now, number of cans of Maaza = 80/16 = 5 Number of cans of Pepsi = 144/16 = 9 Number of cans of Sprite = 368/16 = 23 Thus, the total number of cans required = 5 + 9 + 23 = 37

प्र: A and B can do a work in 4 hours and 12 hours respectively. A starts the work at 6 AM and they work alternately for one hour each. When will the work be completed? 2467 0

  • 1
    4 days
    सही
    गलत
  • 2
    5 days
    सही
    गलत
  • 3
    6 days
    सही
    गलत
  • 4
    7 days
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 3. "6 days"
व्याख्या :

Answer: C) 6 days Explanation: Work donee by A and B in the first two hours, working alternatively = First hour A + Second hour B = (1/4) + (1/12) = 1/3. Thus, the total time required to complete the work  = 2 (3) = 6 days

प्र: A, B and C can do a piece of work in 24 days, 30 days and 40 days respectively. They began the work together but C left 4 days before the completion of the work. In how many days was the work completed? 1390 0

  • 1
    11 days
    सही
    गलत
  • 2
    12 days
    सही
    गलत
  • 3
    13 days
    सही
    गलत
  • 4
    14 days
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 1. "11 days"
व्याख्या :

Answer: A) 11 days Explanation: One day's work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10. C leaves 4 days before completion of the work, which means only A and B work during the last 4 days. Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10. Remaining Work = 7/10, which was done by A,B and C in the initial number of days.  Number of days required for this initial work = 7 days.  Thus, the total numbers of days required = 4 + 7 = 11 days.

प्र: Which of the following is always with bargain? 1547 0

  • 1
    Sumptuousness
    सही
    गलत
  • 2
    Exchange
    सही
    गलत
  • 3
    Triviality
    सही
    गलत
  • 4
    Eloquence
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 2. "Exchange"
व्याख्या :

Answer: B) Exchange Explanation:

प्र: Which of the following is always associated with justice? 2231 0

  • 1
    Hypocrisy
    सही
    गलत
  • 2
    Magnanimity
    सही
    गलत
  • 3
    Legitimacy
    सही
    गलत
  • 4
    Diminutiveness
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 3. "Legitimacy"
व्याख्या :

Answer: C) Legitimacy Explanation:

प्र: If you find yourself in a situation where you are required to make a power - point presentation and you are already bogged down by too much work, as the manager what would you do? 1513 0

  • 1
    Take an alternative mode of presentation
    सही
    गलत
  • 2
    Cancel the seminar and reschedule according to your convenience
    सही
    गलत
  • 3
    Pass the buck to your subordinate, you are the boss, no one can question you
    सही
    गलत
  • 4
    Prioritise your work and try to squeeze out time for it
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 4. "Prioritise your work and try to squeeze out time for it"
व्याख्या :

Answer: D) Prioritise your work and try to squeeze out time for it Explanation: A manager is one who has the expertise to manage tasks properly.So, it becomes his prime responsibility to rearrange his work schedule properly and work out the required time for the project rather than postpone it or hand it over to some one else.

प्र: An Angry customer wants to meet the senior manager for grievance reporting. What will you do? 2701 0

  • 1
    Talk to him yourself
    सही
    गलत
  • 2
    Be patient and try to cool him down
    सही
    गलत
  • 3
    Try to remove his inconveniences by consulting seniors
    सही
    गलत
  • 4
    Tell him it is not easy to meet the senior manager
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 2. "Be patient and try to cool him down"
व्याख्या :

Answer: B) Be patient and try to cool him down Explanation:

प्र: You are a sincere and dedicated manager in a reputed five-star hotel. You have been appointed as the Chief Manager of the Guwahati branch which needs to be developed.Your Salary has been hiked. 6012 0

  • 1
    You give it a shot for 2 months and see how it goes
    सही
    गलत
  • 2
    You accept the challenge and go ahead with the project
    सही
    गलत
  • 3
    You accept another offer and leave the job
    सही
    गलत
  • 4
    You crib for limited resources and try to convince the superior to send somebody else instead of yoiu
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 2. "You accept the challenge and go ahead with the project"
व्याख्या :

Answer: B) You accept the challenge and go ahead with the project Explanation:

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई