Comprehension Test Questions and Answers प्रश्न और उत्तर का अभ्यास करें

प्र:

Read the passage carefully and choose the best answer to each question out of the four alternatives.
The National Highways Network of India measures over 70,934 km as of 2010, including over 1,000 km of limited-access expressways. Out of 71,000 km of National Highways 15,000 plus km are 4 or 6 lanes and remaining 50,000 km are 2 lanes. The National Highways Authority of India (NHAI) is the nodal agency responsible for building upgrading and maintaining most of the national highways network. The national Highways Development Project (NHDP) is a major effort to expand and upgrade the network of highways. NHAI often uses a public-private partnership model for highway development, maintenance and toll collection. National highways constituted about 2% of all the roads in India, but carried about 40% of the total road traffic as of 2010. The majority of existing national highways are two-lane roads (one lane in each direction), though much of this is being expanded to four-lanes, and some to six or eight lanes. Some sections of the network are toll roads. Over 30,000 km of new highways are planned or under construction as par of the NHDP as of 2011. This includes over 2,600 km of expressways currently under construction. 

What is the current measurement of expressways under construction in India ? 

1314 0

  • 1
    15,000 km
    सही
    गलत
  • 2
    30,000 km
    सही
    गलत
  • 3
    26,00 km
    सही
    गलत
  • 4
    1,000 km
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 3. "26,00 km"

प्र:

Read the passage carefully and choose the best answer to each question out of the four alternatives.
The National Highways Network of India measures over 70,934 km as of 2010, including over 1,000 km of limited-access expressways. Out of 71,000 km of National Highways 15,000 plus km are 4 or 6 lanes and remaining 50,000 km are 2 lanes. The National Highways Authority of India (NHAI) is the nodal agency responsible for building upgrading and maintaining most of the national highways network. The national Highways Development Project (NHDP) is a major effort to expand and upgrade the network of highways. NHAI often uses a public-private partnership model for highway development, maintenance and toll collection. National highways constituted about 2% of all the roads in India, but carried about 40% of the total road traffic as of 2010. The majority of existing national highways are two-lane roads (one lane in each direction), though much of this is being expanded to four-lanes, and some to six or eight lanes. Some sections of the network are toll roads. Over 30,000 km of new highways are planned or under construction as par of the NHDP as of 2011. This includes over 2,600 km of expressways currently under construction. 

What is the responsibility of the NHAI? 

1346 0

  • 1
    planning of National Highways
    सही
    गलत
  • 2
    building, upgrading and maintaining of National Highways
    सही
    गलत
  • 3
    control of National Highways
    सही
    गलत
  • 4
    expansion of National Highways
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 2. "building, upgrading and maintaining of National Highways "

प्र:

Read the passage carefully and choose the best answer to each question out of the four alternatives.
The National Highways Network of India measures over 70,934 km as of 2010, including over 1,000 km of limited-access expressways. Out of 71,000 km of National Highways 15,000 plus km are 4 or 6 lanes and remaining 50,000 km are 2 lanes. The National Highways Authority of India (NHAI) is the nodal agency responsible for building upgrading and maintaining most of the national highways network. The national Highways Development Project (NHDP) is a major effort to expand and upgrade the network of highways. NHAI often uses a public-private partnership model for highway development, maintenance and toll collection. National highways constituted about 2% of all the roads in India, but carried about 40% of the total road traffic as of 2010. The majority of existing national highways are two-lane roads (one lane in each direction), though much of this is being expanded to four-lanes, and some to six or eight lanes. Some sections of the network are toll roads. Over 30,000 km of new highways are planned or under construction as par of the NHDP as of 2011. This includes over 2,600 km of expressways currently under construction. 

What is the measurement of two-lane National Highways of India ? 

1175 0

  • 1
    15,000 km
    सही
    गलत
  • 2
    61,000 km
    सही
    गलत
  • 3
    50,000 km
    सही
    गलत
  • 4
    71,000 km
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 3. "50,000 km"

प्र:

Read the passage carefully and choose the best answer to each question out of the four alternatives.
The National Highways Network of India measures over 70,934 km as of 2010, including over 1,000 km of limited-access expressways. Out of 71,000 km of National Highways 15,000 plus km are 4 or 6 lanes and remaining 50,000 km are 2 lanes. The National Highways Authority of India (NHAI) is the nodal agency responsible for building upgrading and maintaining most of the national highways network. The national Highways Development Project (NHDP) is a major effort to expand and upgrade the network of highways. NHAI often uses a public-private partnership model for highway development, maintenance and toll collection. National highways constituted about 2% of all the roads in India, but carried about 40% of the total road traffic as of 2010. The majority of existing national highways are two-lane roads (one lane in each direction), though much of this is being expanded to four-lanes, and some to six or eight lanes. Some sections of the network are toll roads. Over 30,000 km of new highways are planned or under construction as par of the NHDP as of 2011. This includes over 2,600 km of expressways currently under construction. 

What percentage of roads in India are National Highways? 

1329 0

  • 1
    2 %
    सही
    गलत
  • 2
    30 %
    सही
    गलत
  • 3
    4 %
    सही
    गलत
  • 4
    40 %
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 1. "2 %"

प्र:

Read the passage carefully and choose the best answer to each question out of the four alternatives.
The National Highways Network of India measures over 70,934 km as of 2010, including over 1,000 km of limited-access expressways. Out of 71,000 km of National Highways 15,000 plus km are 4 or 6 lanes and remaining 50,000 km are 2 lanes. The National Highways Authority of India (NHAI) is the nodal agency responsible for building upgrading and maintaining most of the national highways network. The national Highways Development Project (NHDP) is a major effort to expand and upgrade the network of highways. NHAI often uses a public-private partnership model for highway development, maintenance and toll collection. National highways constituted about 2% of all the roads in India, but carried about 40% of the total road traffic as of 2010. The majority of existing national highways are two-lane roads (one lane in each direction), though much of this is being expanded to four-lanes, and some to six or eight lanes. Some sections of the network are toll roads. Over 30,000 km of new highways are planned or under construction as par of the NHDP as of 2011. This includes over 2,600 km of expressways currently under construction. 

The majority of National Highways in India have:

1204 0

  • 1
    two-lanes
    सही
    गलत
  • 2
    six-lanes
    सही
    गलत
  • 3
    eight-lanes
    सही
    गलत
  • 4
    four-lanes
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 1. "two-lanes"

प्र:

Read the passage carefully and choose the best answer to each question out of the four alternatives.
The problem of water pollution by pesticides can be understood only in context, as part of the world to which it belongs- the pollution of the total environment of making. The pollution entering our waterways comes from many sources, radioactive wastes from reactors, laboratories, and hospitals; fallout from nuclear explosions; domestic wastes from cities and towns; chemical wastes from factories. To these is added a new kind of fallout the chemical sprays applied to crop lands and gardens, forests and fields. Many of the chemical agents in this alarming melange initiate and augment the harmful effects of radiation, and within the group of chemicals themselves there are sinister and little- understood interactions, transformations, and summations of effect.
Even since the chemists began to manufacture substances that nature never invented, the problems of water purification have become complex and the danger to user of water has increased. As we have seen, the production of these synthetic chemicals in large volume begin in the 1940’s. It has now reached such proportion that an appalling deluge of chemical pollution is daily poured into the nation’s waterways. When inextricably mixed with domestic and other wastes discharged into the same water, these chemicals sometimes defy detection by the methods in ordinary use by purification plants. Most of them are so complex that they cannot be identified. In rivers, a really incredible variety of pollutants combine to produce deposits that sanitary engineers can only despairingly refer to as “gunk”.

water contamination has become serious.

1795 0

  • 1
    Since water pollution was difficult to asses
    सही
    गलत
  • 2
    Since nature has taken a hand in pollution
    सही
    गलत
  • 3
    Since chemists began to use new substance
    सही
    गलत
  • 4
    since businessmen authorised the use of chemicals
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 3. "Since chemists began to use new substance"

प्र:

Read the passage carefully and choose the best answer to each question out of the four alternatives.
The problem of water pollution by pesticides can be understood only in context, as part of the world to which it belongs- the pollution of the total environment of making. The pollution entering our waterways comes from many sources, radioactive wastes from reactors, laboratories, and hospitals; fallout from nuclear explosions; domestic wastes from cities and towns; chemical wastes from factories. To these is added a new kind of fallout the chemical sprays applied to crop lands and gardens, forests and fields. Many of the chemical agents in this alarming melange initiate and augment the harmful effects of radiation, and within the group of chemicals themselves there are sinister and little- understood interactions, transformations, and summations of effect.
Even since the chemists began to manufacture substances that nature never invented, the problems of water purification have become complex and the danger to user of water has increased. As we have seen, the production of these synthetic chemicals in large volume begin in the 1940’s. It has now reached such proportion that an appalling deluge of chemical pollution is daily poured into the nation’s waterways. When inextricably mixed with domestic and other wastes discharged into the same water, these chemicals sometimes defy detection by the methods in ordinary use by purification plants. Most of them are so complex that they cannot be identified. In rivers, a really incredible variety of pollutants combine to produce deposits that sanitary engineers can only despairingly refer to as “gunk”.

Water pollution can only be understood

1313 0

  • 1
    in relation to world contamination
    सही
    गलत
  • 2
    by the whole human race
    सही
    गलत
  • 3
    in context
    सही
    गलत
  • 4
    in relation to the number of pesticides that exist
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 1. "in relation to world contamination"

प्र:

Read the passage carefully and choose the best answer to each question out of the four alternatives.
The problem of water pollution by pesticides can be understood only in context, as part of the world to which it belongs- the pollution of the total environment of making. The pollution entering our waterways comes from many sources, radioactive wastes from reactors, laboratories, and hospitals; fallout from nuclear explosions; domestic wastes from cities and towns; chemical wastes from factories. To these is added a new kind of fallout the chemical sprays applied to crop lands and gardens, forests and fields. Many of the chemical agents in this alarming melange initiate and augment the harmful effects of radiation, and within the group of chemicals themselves there are sinister and little- understood interactions, transformations, and summations of effect.
Even since the chemists began to manufacture substances that nature never invented, the problems of water purification have become complex and the danger to user of water has increased. As we have seen, the production of these synthetic chemicals in large volume begin in the 1940’s. It has now reached such proportion that an appalling deluge of chemical pollution is daily poured into the nation’s waterways. When inextricably mixed with domestic and other wastes discharged into the same water, these chemicals sometimes defy detection by the methods in ordinary use by purification plants. Most of them are so complex that they cannot be identified. In rivers, a really incredible variety of pollutants combine to produce deposits that sanitary engineers can only despairingly refer to as “gunk”.

The word ‘gunk’ in the last line refers:

1133 0

  • 1
    to the waste products deposited by sanitary engineers
    सही
    गलत
  • 2
    to the debris found in rivers
    सही
    गलत
  • 3
    to unidentifiable chemicals found in water
    सही
    गलत
  • 4
    to the domestic water supplies
    सही
    गलत
  • उत्तर देखेंउत्तर छिपाएं
  • Workspace

उत्तर : 2. "to the debris found in rivers"

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई

      त्रुटि की रिपोर्ट करें

    कृपया संदेश दर्ज करें
    त्रुटि रिपोर्ट सफलतापूर्वक जमा हुई